The progress is that the exterior walls, roof, bathrooms (one boys and one girls restrooms with two toilets each and a sink for each), kitchen floor, and well are completed. The fence is mostly done, but we do not have a gate. The other items left to start/complete include electrical, plumbing, install 9 windows, install an exterior door, desks, chairs, book shelves, kitchen roof, kitchen shelves, beds, interior walls for bedrooms, interior walls for class rooms, ceiling.
Here is a slideshow of all the construction pictures!
Here is a picture of the construction crew.
Back row:
David Tyler from Pennsylania
Jeff Nolta from Washington
Laura Olderog from Arizona
Matt Harman from Pennsylania
Teresa Wegner from Colorado
Kamina Johnson from Colorado
Front row:
Randy Decker from Pennsylania
Eric Lews from Pennsylania
Jeremy Johnson from Colorado
Click here for a great newspaper article about the 4 men who were on the team that traveled from Pennsylvania!
4 comments:
Yipppeeee! It's amazing!!
Are you kidding me with this...that is absolutely freakin' amazing!!!!!! You and Jeremy must and and should be so proud of yourselves. You had a dream and you did it. I am so impressed. You built something from the ground up, literally!
I'm glad to see you cut in windows, I was a little worried in the beginning. And the huge tubs of bug killer was great.
So do tell, what now is in store for the building? Who will finish it up? When will children move in, etc...
Congratulations, you guys did it!!
Soooooo much work! I'm so thankful you showed all the details... You just don't think of all the sweat that was going to be involved, so much that we didn't even think about.
Thank you for going. Thank you for persevering. Thank you for all your hard work. Thank you for letting God use you. Thank you for showing you passion as you have. Thank you! Thank you! Thank you!
well done!!! it's amazing how much you can do with the big Guy on your side.
Post a Comment